A tour of the restored building

A tour of the restored building 21 March 2025 In March 2025, with some excitement, we invited two groups of special guests to the first fully renovated building of Stara Rzeźnia: real estate experts representing investors and journalists. Their opinions matter greatly, as they influence how Poznan’s residents and future office, apartment, and retail space […]
The staircase regains its former glory

The staircase regains its former glory 17 March 2025 In the first of the buildings being restored in Stara Rzeźnia, a particularly striking feature is the beautifully renovated staircase. The balusters have been faithfully recreated based on the preserved, though time-worn, originals. Just like the entire complex, this detail has come into full circle in […]
125 years of Poznan’s municipal slaughterhouse

125 years of Poznan’s municipal slaughterhouse 15 March 2025 https://stararzezniapoznan.pl/wp-content/uploads/2025/03/125-LAT-RZEŹNI-MIEJSKIEJ_1.mp4As we complete the renovation of the first building in the Stara Rzeznia complex, it coincides with a significant milestone—exactly 125 years since the construction of Poznan’s municipal slaughterhouse. Interestingly, this first restored building was also one of the very first built as part of the […]
We saved the original floor tiles

We saved the original floor tiles 10 February 2025 Upon entering the former daycare building, visitors immediately step onto the original tiled flooring from the time of construction. The tiles were produced by Villeroy & Boch, a company still renowned today for its high-quality craftsmanship. We carefully cleaned and preserved the flooring in place, despite […]
The magic of restoration

The magic of restoration 10 January 2025 https://stararzezniapoznan.pl/wp-content/uploads/2025/01/MAGIA-ODNOWY-WEWRSJA-KRÓTKA-BEZ-WYPOWIEDZI_1.mp4 We have officially completed the renovation of the first building at Stara Rzeźnia!This was a full-scale renovation—from basement to roof. First, we secured the trees around the building, then excavated the foundations and installed waterproofing. The facade has been restored to near-perfect condition. We also demolished an […]
Renovating Building H17 – from basement to roof

Renovating Building H17 – from basement to roof 9 November 2024 Meanwhile, at Stara Rzeznia… revitalization work continues in the first building of the complex. For those interested, it’s the structure visible from Garbary Street—on the left side of the entrance gate to the former plant. The building once served residential purposes before becoming an […]
Work in the former daycare is in full swing, but we can already see the finish line

Work in the former daycare is in full swing, but we can already see the finish line 11 October 2024 https://stararzezniapoznan.pl/wp-content/uploads/2024/10/stara-rzeźnia-wrzesień-budowa-1.mp4 Meanwhile, at our site, the work is progressing rapidly. Soon, we will begin finishing the interiors of one of the villas visible from Garbary Street while continuing to perfect the facade—brick by brick. New […]
Once a daycare…

Once a daycare… 10 September 2024 https://stararzezniapoznan.pl/wp-content/uploads/2024/09/Przedszkole.mp4 The H17 building originally served as a residential facility before becoming an administrative office. After World War II, it briefly housed an employee daycare center.
Vastint invests in a stormwater collector for the Old Town

Vastint invests in a stormwater collector for the Old Town 20 August 2024 https://stararzezniapoznan.pl/wp-content/uploads/2024/08/Kolektor-Short-Two.mp4 The stormwater collector we are building will have a total capacity of over 720 m³—equivalent to a large swimming pool at “Chwialka.” However, it will never be entirely filled with water, as its main purpose is to efficiently drain excess rainwater […]
Storms and downpours are no threat to us!

Storms and downpours are no threat to us! 8 August 2024 https://stararzezniapoznan.pl/wp-content/uploads/2024/08/Kolektor-Short-One-1.mp4 A stormwater collector is being reconstructed at Stara Rzeźnia in Poznań. This 360-meter-long section will collect excess rainwater from the historic Old Town area. The entire investment is financed by Vastint Poland. “The collector is a concrete pipe with a diameter of 1.6 […]